Gold Member Since 2012
Audited Supplier
Dongguan Yixun Industrial Co., Ltd.

Safety Hammer Mold, Plastic Safety Hammer Mold, Mould manufacturer / supplier in China, offering Plastic Safety Hammer Injection Mold, Car Part Mold, Plastic Car Parts Mold, Plastic Injection Mould /Mold, on Sales and so on.

(/ )

Supplier Homepage Product Auto Cars Mould and Moulding Plastic Safety Hammer Injection Mold

Plastic Safety Hammer Injection Mold

FOB Price: US $5 / Piece
Min. Order: 8,000 Pieces
Min. Order FOB Price
8,000 Pieces US $5/ Piece
Get Latest Price
Port: Shenzhen, China
Production Capacity: 50 Sets/Month
Payment Terms: L/C, T/T, D/P

Request a custom order and have something just for you!

Send Customized Request
Basic Info
  • Model NO.: fa234
  • Surface Finish Process: Polishing
  • Plastic Material: ABS
  • Application: Car, Commodity, Home Use
  • Design Software: Pro-E
  • Certification: TS16949, ISO
  • Customized: Customized
  • Drawing Format: STP / X-T / Igs / Dwg
  • Injection Size: According Client′s Drawing or Sample
  • Payment: T/T
  • Company Style: Factory
  • Trademark: Yixun
  • Specification: Customized
  • HS Code: 8480710009
  • Shaping Mode: Injection Mould
  • Mould Cavity: Single&Multi Cavity
  • Process Combination Type: Injection
  • Runner: Hot&Cold Runner
  • Installation: Injection
  • Standard: HASCO
  • Mold Standard: Lkm / Hasco / Dme / Ftaba
  • Dimension Tolerance: ISO02768
  • Delivery Time: Customized
  • Service: OEM
  • Mold Material: Nak80, Steel 20, 1.2738 and So on
  • Transport Package: Plywood Case
  • Origin: Guangdong, China
Product Description
Plastic safety hammer injection mold
Basic information of our company:
With near 20 years'development, Yixun now have the area of  more than 60,000 square meter, regular employees more than 100 and 70 among of them have experience over 10 years.
High precision plastic part production injection mould
Our business scope:
1. Plastic mould design & fabrication
2. Injection moulding
3. Secondary operation
Our product range:
1. Automobile mold & parts
2. Electricals mold & parts
3. Communications mold & parts
4. Double color mold & parts
5. Deep barrel series mold & parts
6. Clear parts & mold
7. Precision parts & mold
 Specifications
Shaping ModePlastic Moulding part & injection parts
Application: IndustryAuto ,Medical, Home appliance,  Daily Community, Telecommunication
Production EquipmentElite Plastic Injection Machines ,CNC, Mirror EDM machine, Wire Cutting machine, Carving machine, Lathe
Drilling machine, Grinding machine, Milling machine,
Material steelP20, 738, 738H, 718, 718H, NAK80, S136, S136H, 2378H, 2311, 2083, 2316, H13, SKD61, 2344, 8407 
And other material as requirement
Part material ABS, PP,PC,  POM ,PVC, PE, PET, PMMA , Acrylic,  and other material As requirement
QC Machine3D Measurement,  Profile Projector, Hardness Tester and other regular size inspection equipment.
Mold CavitySingle or Multi-Cavities Available
Runner SystemCold or Hot-Runner Available(Hasco, yudo, d-m-e etc.)
Mould BaseLKM, HASCO, DME etc
Hardness of steelVacuum quenching  ,Nitride, HRC41-47, HRC46-50,HRC60
Standard mould partsDme, hasco, JIS, cumsa etc.
Mold Lead time4Weeks T1 samples , exact time depends on Mould Complexity
Mould Life0.3 Million Shots- 1Million shots (Different steel different production, min mold life 200, 000 shots)
PackingExporting standard (Free fumigation case)
 Our advandage
1.Professional manufacturer 
2.Certificates: ISO 9001:2008,TS16949 
3. Highly skilled manufacturing  process
4. A variety of ODM&OEM product range
5. Strict quality Control System
6. Advanced equipment and excellent R&D Team
7.Software for specification drawings: Pro/E, Auto CAD, solid work 2001,CAXA,UG,CAD,CAM
Business Step 
1.R&DWe support customer R&D. Make the files or improve the design if you needed 
↓↓↓
2.Quotation MakingMould Quotation will be finished in  1  day according to information we get
↓↓↓
3.Negotiation The quality ,price ,material, delivery time .payment item. ect 
↓↓↓
4.Mould Design 3-5  days for mould and product 3D/2D drawing design
↓↓↓
5.MouldAccording to customers' request to build the mould.Before make the mould .we send mould design to customer approval first . Mould will be usually finished in  25-60  days 
↓↓↓
6.Mould TestingWhen moulds are finished,we will test the moulds to check it satified consumers' needs.And we will  send samples  for consumers' reference.
↓↓↓
7.Sample confirm If the first sample come out is not satisfied customer .we modify the mould and until meet customers satisfactory 
 ↓↓↓ 
8.Delivery Delivery goods by  sea  or by  air  ,according  customers requirement 
Contact information:
Dongguan Yixun Industrial Co.,Ltd.
Joyce sales
Add: Building 1, ZhuGang RD # 19, ShaTou Community, Chang'An Town,
DongGuan City, GuangDong Province, China
Send your message to this supplier
Avatar
Miss joyce
*From:
To: Miss joyce
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now