Gold Member Since 2012
Audited Supplier
Dongguan Yixun Industrial Co., Ltd.

Mould, Mould Maker, Cover Mould manufacturer / supplier in China, offering Plastic Fuel Gas Filler Pipe Top Cover Mould Maker, Car Part Mold, Plastic Car Parts Mold, Plastic Injection Mould /Mold, on Sales and so on.

(/ )

Supplier Homepage Product Auto Cars Mould and Moulding Plastic Fuel Gas Filler Pipe Top Cover Mould Maker

Plastic Fuel Gas Filler Pipe Top Cover Mould Maker

FOB Price: US $8,500 / Set
Min. Order: 1 Set
Min. Order FOB Price
1 Set US $8,500/ Set
Get Latest Price
Production Capacity: 500set /Year
Transport Package: Customized
Payment Terms: L/C, T/T, D/P, Paypal

Request a custom order and have something just for you!

Send Customized Request
Basic Info
  • Shaping Mode: Injection Mould
  • Mould Cavity: Single Cavity
  • Process Combination Type: Injection Mould
  • Runner: Cold Runner
  • Installation: Cusotmized
  • Standard: DME
  • Shape Type: Injection
  • Part Material: ABS, PVC, PC, PA6, POM and So on
  • QC Machine: 3D Measurement, Profile Projector
  • Dimension Tolerance: ISO02768
  • Export Country: Over The World
  • Specification: customized
  • Surface Finish Process: Polishing
  • Plastic Material: ABS
  • Application: Car
  • Design Software: Pro-E
  • Certification: TS16949, ISO
  • Customized: Customized
  • Mold Material: Nak80, Steel 20, 1.2738 and So on
  • Tool Machine: CNC, CNC-Wirecut, E.D.M, Milling, Grinding
  • Drawing Format: STP / X-T / Igs / Dwg
  • Mould Life: 0.3 Million Shots- 1million Shots
  • Trademark: YIXUN
  • Origin: China Dongguan
Product Description
plastic fuel gas filler pipe top cover mould maker
Basic information of our company:
With near 20 years'development, Yixun now have the area of  more than 60,000 square meter, regular employees more than 100 and 70 among of them have experience over 10 years.
High precision plastic part production injection mould
Our business scope:
1. Plastic mould design & fabrication
2. Injection moulding
3. Secondary operation
Our product range:
1.car mirror cover mould & parts
2.car grille mould & parts
3.shift knobs mould & parts
4.car door handle mould & parts
5.air filter mould & parts
6.car windshield wiper mould & parts
7.car lamp cover
Specifications
Shaping ModePlastic Moulding part & injection parts
Production EquipmentElite Plastic Injection Machines ,CNC, Mirror EDM machine, Wire Cutting machine, Carving machine, Lathe
Drilling machine, Grinding machine, Milling machine,
Material steelP20, 738, 738H, 718, 718H, NAK80, S136, S136H, 2378H, 2311, 2083, 2316, H13, SKD61, 2344, 8407
And other material as requirement
Part materialABS, PP,PC,  POM ,PVC, PE, PET, PMMA , Acrylic,  and other material As requirement
QC Machine3D Measurement,  Profile Projector, Hardness Tester and other regular size inspection equipment.
Mold CavitySingle or Multi-Cavities Available
Runner SystemCold or Hot-Runner Available(Hasco, yudo, d-m-e etc.)
Mould BaseLKM, HASCO, DME etc
Hardness of steelVacuum quenching  ,Nitride, HRC41-47, HRC46-50,HRC60
Standard mould partsDme, hasco, JIS, cumsa etc.
Mold Lead time4Weeks T1 samples , exact time depends on Mould Complexity
Mould Life0.3 Million Shots- 1Million shots (Different steel different production, min mold life 200, 000 shots)
PackingExporting standard (Free fumigation case)
Our advandage
1.Professional manufacturer
2.Certificates: ISO 9001:2008,TS16949
3. Highly skilled manufacturing  process
4. A variety of ODM&OEM product range
5. Strict quality Control System
6. Advanced equipment and excellent R&D Team
7.Software for specification drawings: Pro/E, Auto CAD, solid work 2001,CAXA,UG,CAD,CAM
Project management flow
Business Step
1.R&DWe support customer R&D. Make the files or improve the design if you needed
↓↓↓
2.Quotation MakingMould Quotation will be finished in  1  day according to information we get
↓↓↓
3.NegotiationThe quality ,price ,material, delivery time .payment item. ect
↓↓↓
4.Mould Design3-5  days for mould and product 3D/2D drawing design
↓↓↓
5.MouldAccording to customers' request to build the mould.Before make the mould .we send mould design to customer approval first . Mould will be usually finished in  25-60  days
↓↓↓
6.Mould TestingWhen moulds are finished,we will test the moulds to check it satified consumers' needs.And we will  send samples  for consumers' reference.
↓↓↓
7.Sample confirmIf the first sample come out is not satisfied customer .we modify the mould and until meet customers satisfactory
↓↓↓
8.DeliveryDelivery goods by  sea  or by  air  ,according  customers requirement

Contact information:
Dongguan Yixun Industrial Co.,Ltd.
Veronica sales
Add: Building 1, ZhuGang RD # 19, ShaTou Community, Chang'An Town,
DongGuan City, GuangDong Province, China

Send your message to this supplier
Avatar
Miss veronica
*From:
To: Miss veronica
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now

Find Similar Products By Category